Hattın harita üzerinde güzergahı
Dapinglin
→
New Taipei Industrial Park
Dapinglin → New Taipei Industrial Park
New Taipei Industrial Park → Dapinglin
See route stops on the map
CloseService Directions
Dapinglin → New Taipei Industrial Park
New Taipei Industrial Park → Dapinglin
Operating dates and week days
Everyday
Whole year
Timetable
06:00 - 00:00 every 5 min
Taşıma aracının türü ve sayısı:
Metro 6 - Circle Line
Geçtiği sokaklar:
大坪林 -- 新北產業園區
Toplu Taşıma Dairesi:
Taipei Metro
Ek Bilgi:
Only 14 station of phase 1 has been opened.
Güzergah istatistikleri:
The length of the trip line №1: 15.06 km
Duraklar: 14
The length of the trip line №2: 15.05 km
Duraklar: 14
Duraklar: Dapinglin → New Taipei Industrial Park
Duraklar: New Taipei Industrial Park → Dapinglin
Yorumlar :