Trajectoire de l'itinéraire sur la carte
South Station (Underground)
→
Logan Airport Terminal A
South Station (Underground) → Logan Airport Terminal A
Logan Airport Terminal A → South Station (Underground)
See route stops on the map
CloseService Directions
South Station (Underground) → Logan Airport Terminal A
Logan Airport Terminal A → South Station (Underground)
Operating dates and week days
Weekdays
Whole year
Timetable
04:25 - 01:06 every 10 min
Operating dates and week days
Sa
Whole year
Timetable
04:46 - 01:07 every 10 min
Operating dates and week days
Su
Whole year
Timetable
05:46 - 01:08 every 10 min
Le genre et le numéro de transport:
Trolley bus SL1
Passes dans les rues:
South Station - Logan Airport Terminal A
Agence du transite:
Massachusetts Bay Transportation Authority
Information additionnelle:
* $2.25 - CharlieCard
$2.75 - CharlieTicket or Cash
The Silver Line is the bus rapid transit (BRT) system of the Massachusetts Bay Transportation Authority (MBTA). It currently operates five routes in two sections that were built in separate phases.
Statistiques de l'itinéraire:
The length of the trip line №1: 7.43 km
arrêts: 5
The length of the trip line №2: 8.5 km
arrêts: 10
arrêts: South Station (Underground) → Logan Airport Terminal A
arrêts: Logan Airport Terminal A → South Station (Underground)
Commentaires :