Due to Bridge Street closure buses run on diversion via Victoria Embankment in both directions. The diversion is expected to last to mid-November 2019.
إحصاءات الطريق:
The length of the trip line №1: 17.0 كم مناطق التوقف: 54
The length of the trip line №2: 16.69 كم مناطق التوقف: 51